Home/Projects/Aleziyat Complex
Commercial & Residential 2025 Benghazi, Libya Turnkey Delivery

Aleziyat Mixed-Use Complex

Integrated mixed-use urban development — combining commerce, retail, and contemporary living.

Location Benghazi, Libya
Category Commercial & Residential
Primary Scope Large-Scale Multi-Story Civil Construction, Basements & Infrastructure

Project Overview

High-density commercial podium with residential towers and multi-level underground parking.

A large-scale urban development integrating ground-floor retail promenades, commercial office floors, and residential apartments above an engineered multi-level subterranean parking facility.


MERAAS executed deep basement excavation, retaining wall shoring, heavy foundation raft pouring, and rapid post-tensioned slab construction utilizing our heavy in-house machinery fleet and concrete batching logistics.

The project stands as an exemplar of coordinated urban density in Benghazi, delivering durable structural integrity, modern MEP utility shafts, and high-traffic public pedestrian avenues.

Key Engineering Highlights
  • Deep Shored Basement Excavation & Retaining Walls
  • Heavy Raft Foundations & Post-Tensioned Slabs
  • Multi-Level Underground Parking Logistics
  • High-Speed Vertical Transportation & Core Shafts
Technical Datasheet 2025
Location
Benghazi, Libya
Year Completed
2025
Category
Mixed-Use Retail & Residential
Scope
Turnkey Civil, Structure & Shell
Built-up Area
32,000+ sqm Gross Floor Area
Levels
2 Basements + Podium + 7 Towers
QA/QC Standard
ISO 9001 Heavy Civil QA/QC

MERAAS Execution Capabilities

Disciplines Deployed on Site

Executed entirely through our in-house workforce, specialized plant machinery, and certified quality management systems.

01 / DISCIPLINE

Geotechnical & Shoring

Secant pile retaining walls, soil dewatering, and bulk excavation.

02 / DISCIPLINE

Heavy Concrete Works

Mass concrete foundation rafts, columns, shear walls, and flat slabs.

03 / DISCIPLINE

Site Utilities & Drainage

High-capacity storm stormwater retention, sewage, and electrical feeder routing.

04 / DISCIPLINE

Project Command & Craneage

Coordinated tower crane operations and strict site safety management.

Al-Watan Shooting & Equestrian Club
Next Case Study

Al-Watan Shooting & Equestrian Club

Sports & Leisure · Benghazi, Libya